Table 1: Foundation Lengths
:Pl gA=1."t I_i_[o] L'_I:,[o1L_I=1L_iiI_
b}
Model Foundation Length, Inches
LC-04 37"/_,
LC 05 42:_,_
LC 06 47V_,
LC-07 521/z
kC-08 57%
LC-09 62%
LC 10 67:_/4
LC 11 72%
kC-12 77%
LCE 13 83'/2
LCE-14 889/16
LCE-15 935A_
LCE-16 98nA6
LCE 17 1033/4
LCE-18 108Wl_
LCE-19 1137/8
LCE 20 118_5/,6
LCE-21 124
LCE-22 129'/16
LCE-23 134'/8
LCE 24 139_/1_
If the foundation must be a concrete slab, use an
air cell high temperature insulating board, at least
I/2" thick, with aluminum backing, aluminum
side up. A I/2" thick high temperature millboard
with aluminum backing is acceptable as well.
Place the insulating board on the slab between
the steel channels.
I_1 IIL_k'tl If;1! IL*_III[o] L_l.'t I J:{vJa '
For new and existing installations, a Steam Installation
Survey is available from Peerless Heater Company. The
survey will provide information on how a steam boiler
works with your specific system and will provide an
overview of steam system operation in general.
You can also use this survey to locate system problems
which will have to be corrected. To obtain copies of the
Steam Installation Survey, contact your Peerless
representative.
I.
2.
3,
Packaged: All components should be inside crate. In
some cases the burner may be shipped separately,
Optional equipment, such as barometric draft
dampers, may also be shipped separately.
Knockdown: All components shipped for field
assembly, See Table 2 for standard components. See
Tables 3 through 8 for optional components.
a) Channel Rails
b) Sections
c) Assembly Kit Carton(s): Includes flow port
gaskets, tie rods with hardware, high temperature
rope, and deanout cover plates.
d) Flue Box Carton: Includes flue box, rear flue
cover plate (LCE only), rear observation
assembly and port cover plates.
e) Baffle Carton
i) LC: Includes baffles, combustion chamber
liner, rating label and ASME plate
ii) LCE-21 through LCE-24: Baffles
f) Jacket Cartons
g) Draft Damper (LCE only)
h) Label Carton (LCE only)
i) Burner Mounting Plate
j) Trim Carton: Includes safety valve and pressure
gage
k) Control Carton: Limit controls
I) Tankless Heater(s}
m) Additional controls and fittings
Assembled Block: Same as knockdown except
channel rails, sections and assembly kit cartons are
assembled into a block as a single shipping level
component.
[_ I:JIF_'I_I_IIL_[€: ii:l_ ilr;\Y.lll
Prepare sketches and notes of the layout to minimize the
possibility of interferences with new or existing
equipment, piping, venting and wiring.
5