SERIES LCE SPECIFICATIONS
\
Rear Flue
Cover
R
E
A
R
Cast Iron Block Assembly-Top Flue Outlet
Butterfly Flue Damper (Series LCE)
Mounted Horizontally or Vertically
TOp
_l_ <D I
4_/,_" • .* G _ 4,_,_¢ 16'_1(_ 4"SupplyTappings
]- : _ (_) 3"RearReturnTapping
• I=.=._o _) 3"Side Returns
c " Re"r°b e 'ati°nF "
63" T _ 3"IntermediateSupply
"ii __, 4_/£ Tappings
37" @ lye Line M_ximum POWERFLAMEC=36"
Burner G CRDON & RATr R = _7 _
FRONT RIGHT SSDE REAR Lengths: WEBSTER J=31"
Note: Series LCE steam boiler pictured, Series LCE water boiler has, at most, two tapped intermediate sections.
Boiler
Model
Number
LCE-13
LCE-t4
LCE-15
LCE-16
LCE-17
LCE-18
LCE-19
LCE-20
LCE-21
LCE-22
LCE-23
LCE-24
Width
"A"
37"
37"
37"
37"
37"
37"
37"
3T'
37"
37"
37"
37"
Jacket Left of Front of
Jacket to Jacket to
Top to C/L of C/L of Flue
Length Floor Flue Flue Size
"B .... C.... D.... E.... F"
715/4" 63" 16" 20%" 14"
76_5/16" 63" 16" 20V2" 14"
81%" 63" 16" 20%" 14"
86_%6" 63" 16" 201/2" 14"
92 Vs" 63" 16" 20V2" 14"
97_A6" 63" 16" 20V2" 16"
102W' 63" 16" 20'/2" 16"
1077/_s'' 63" 16" 20'/2" 16"
112W' 63" 16" 20%" 16"
1179/,6" 63" 16" 20%" 16"
122%" 63" 16" 20W' 16"
127_/_ " 63" 16" 201/2" 16"
Distance Between Tappings*
Water Steam
"G .... G1 .... G2 .... G1.... G2 .... G3 .... G4"
625/16" 363/16" -- 365/16" -- -- --
67V4" 41%" -- 201-%6" 20%6" -- --
72%6" 46%" -- 26" 20%6" -- --
777/_6' 517/_6" -- 26" 255/_6" -- --
82W' 41%" -- 2015/'16" 20_/_e" 151/'4" --
875/16" 41V4" -- 20_%6" 205/_e" 205/_6" --
92%" 41 _/4" -- 20_16" 205/16 " 257/16 " --
973/'4" 41%" -- 2015/;6" 205/16" 15Y_" 15%"
102_3/_" 41VZ' 35%6" 2015/16" 205/16" 205/16" 15%"
107%" 41V." 40%" 2O_/_e" 20%s" 20%6" 205/_6"
1121%_" 46%" 40%" 26" 20_A_" 20%6" 20"%_"
1t 81/_" 46%" 45 _/_6" 26" 205/_6" 205/_#' 26
Apply Prefix "O" for oil--"G" for gas "GO" for gas-oil. " Dimensions are approximate.
The manufacturer should be consulted before selecting a boiler for installations having unusual piping and pickup requirements, such as intermittent system operation,
extensive piping, etc For forced hot water heating systems where the boiler and all the piping are within the area to be heated, the boiler may be selected on the
basis of its Gross Output.