Test And Inspection Matrix
8 Performance Verification
Test And Inspection Matrix
The following test map shows which tests are required in which situations.
Table 1 Test Map
Service Event (When
Performing…)
Test Blocks Required (…Complete
these Tests)
Installation Visual and Power On Tests
Repairs
A. Unit Exchange Visual and Power On Tests
B. Unit Opened Power On Test
Basic Pneumatic Leakage Test (BPL)
Ground Integrity Test
Leakage Current Test
C. NBP Pump replaced Power On Test
NBP Tests:
Pneumatic Leakage and Inflation Rate
D. SpO
2
Module replaced Power On Test
BPL Test
SpO
2
Tests:
Dynamic Operating Range and
LED Excitation
E. Front End Connectors replaced Power On Test
BPL Test
Performance test for the parameter that had
the connector replaced.
F. Power Supply replaced (A3 only) Power On, BPL, and Safety tests
G. Component level repair on any
PC board
Power On Test
All Performance Tests
All Safety Tests
H. Main PC board replaced Power On Test
All Performance tests except Battery
Charge Test and Battery Performance Test
All software upgrades Power On
Preventative maintenance Power On and NBP Performance Tests