11
TexJet® ECHO²
Table 4: Pretreatment curing times.
PRETREATMENT
TEMPERATURE TIME
POLYCOATING
160º C
(320º F)
30’’
DUPONT P5001
PRETREATMENT
DUPONT P5003
PRETREATMENT
NOTE: Wear protective gloves/protective clothing/eye protection/
face protection when using a manual hand sprayer (Wagner) to
apply pretreatment.
Maintenance Schedule
Table 5: Maintenance Schedule.
DAILY
(When in operation)
• Capping Station Cleaning
• Wiper Cleaning
• Head Inspection
WEEKEND
• Head Soaking
MONTHLY
• Scale CR Cleaning
• Carriege Shaft Cleaning
SIX MONTH
• Cartidge Cleaning
LONG INACTIVITY
• Draining the System
NOTE: During maintenance procedures, do not let the Print Head
unlocked for more than 15 min.