4.6 Operation in wet rooms
In the supplied status, the Paramount conforms in case of room air-independent
operation to international protection type IPx4D ().
In the case of installation in wet rooms, the following conditions must be met:
- Room air-independent operation
- to maintain protection type IPx4D:
- Operation of the room device or thermostat not in wet rooms!
- All outgoing or incoming electrical lines must be installed through tension re-
lease screw fittings and fixed. The screw firttings have to be tightened, so
that no water can enter the inside of the housing!
4.7 Notes for installation
location
Caution! Danger of damage from water!
The following has to be observed for the installation of the Paramount:
In order to prevent damage due to water, particularly due to leakages in the DHW
storage tank, suitable precautionary measures should be taken regarding installa-
tion.
4.7.1 Installation room
The installation room must be dry, the room temperature must be between 0 and
40°C.
The installation location has to be selected, especially, with respect to ducting of
the exhaust gas flues. When installing the boiler, the specified wall clearances
have to be maintained.
Along with the general rules of the technology, the regulations of the country,
such as fire and construction regulations as well as heating room guidelines, are to
be observed. Sufficient space should exist in the front to carry out inspection and
maintenance work.
Caution! Danger of damaging the device!
Aggressive foreign substances in the combustion supply air can destroy or damage
the heat generator. Therefore the installation in rooms with high humidity or
heavy dust accumulation is not allowed.
Operation of Paramount boilers in rooms in which solvents, chorine containing
cleaning agents, paint, glues or similar substances are worked with or in which
such substances are stored is not permissible. This applies especially for rooms in
which
ammonia and its compounds are heavily used, as well as nitrites and sul-
phides (animal breeding and recycling facilities, battery and galvanising rooms,
etc.).
Caution! Danger of damaging the device!
Furthermore it is to be observed that under aggressive atmospheres even the boil-
er external installation can be attacked. To this are also included especially alumi-
nium, brass and copper installations.
For damages occurring due to the installation in an unsuitable location or based
on improper combustion air supply, there is no warranty claim.
Prior to installation
22 Paramount three 30-115 kW 7308272-03 03.14