6.8 Guide for commissioning
Tab. 8: Guide for commissioning
1. System location
2. Customer
3. Boiler type/Designation
4. Serial number
5.
Characteristic gas values
Gas Type ..........................
6. Natural Gas / LPG kWh/m³ ..........................
7. Have all pipelines and connections been checked for tightness? □
8. Exhaust gas system checked? □
9. Gas pipeline checked and purged? □
10. Static pressure measured at the gas valve inlet? mbar ...............................
11. Free wheeling of pumps checked? □
12. Filling the heating plant □
13. Used water additives ...............................
14. Gas flow pressure measured at full load at the gas valve inlet? mbar ...............................
15. Gas injector pressure measured at full load at the gas valve outlet? mbar ...............................
16. CO
2
-content at low load % ...............................
17. CO-content at low load ppm ...............................
18. CO
2
-content at full load % ...............................
19. CO-content at full load ppm ...............................
20.
Function test:
Heating mode □
21. DHW operation □
22.
Programming:
Time /date □
23. Comfort setpoint heating circuit 1/2 °C ...............................
24. Setpoint DHW °C ...............................
25. Automatic day time programme Clock ...............................
26. Heating curve checked? □
27. Tightness of the flue system checked in operation (e.g. CO
2
test in annular gap)?
28. Customer instructed? □
29. Documents handed over? □
Only components tested and marked according to he respective standard have been used.
To ensure the heat source operates reliably and economically for a long period,
we recommend annual maintenance for the heat source.
Date /signature