EasyManuals Logo

Precor SPINNER CLIMB User Manual

Precor SPINNER CLIMB
197 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #88 background imageLoading...
Page #88 background image
.
b. Secure the Data COMM cable and Strain Gauge cables to the right fork weld-
ment lower push-mount cable tie:
l
Place the Data COMM cable and Strain Gauge cable into the right fork
lower push-pin cable tie. Adjust each cable to the prior marked lower
push-pin reference mark (tape or pen) and tighten the cable tie.
l
Alternatively, adjust the Data COMM and Strain Gauge cable lengths to
the prior measured length from the LPCA cable connectors to the lower
push mount cable tie and then tighten the cable tie. If you did not make
these measurements, adjust the DataCOMM cable length to approx. 25
in (63.5 cm) and the Strain Gauge cable length to approx. 21 in (53 cm)
and tighten the cable tie.
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
Page 80
5 Replacement Procedures
Data COMM Cable Replacement

Table of Contents

Other manuals for Precor SPINNER CLIMB

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Precor SPINNER CLIMB and is the answer not in the manual?

Precor SPINNER CLIMB Specifications

General IconGeneral
BrandPrecor
ModelSPINNER CLIMB
CategoryExercise Bike
LanguageEnglish

Related product manuals