EasyManua.ls Logo

Prochem PEAK - Receiving Your Unit; Acceptance of Shipment; Equipment List

Prochem PEAK
101 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RECEIVING YOUR UNIT
PEAK 86037220 02/12/07
4
ACCEPTANCE OF SHIPMENT
Every part of your cleaning unit was carefully
checked, tested, and inspected before it left our
manufacturing plant. Upon receiving the unit, make
the following acceptance check:
1. The unit should not show any outward signs of
damage. If damaged, notify the delivering carrier
immediately.
2. Check your equipment and packing list. The
cleaning unit should arrive equipped with the
following items (unless otherwise specified).
NOTE: Your distributor from whom you
purchased this mobile cleaning unit is
responsible for the correct installation of this
machine. The dealer is also responsible for initial
training of your operators and maintenance
personnel in the proper operation and
maintenance of this unit.
EQUIPMENT LIST:
1. Console.
2. Waste tank
3. Hose clamps for vacuum hoses.
4. 100 ft. of 2” vacuum hose.
5. 1 vacuum hose connection.
6. 100 ft. of 1/4" high pressure hose with quick
connects.
7. 50 ft. water supply hose with quick connect.
8. Installation bolting kit.
9. Installation mounting plates.
10. Operation and service manual for engine, water
pump, and vacuum pump.

Table of Contents

Related product manuals