OB7 Collaborative Robot User Manual Version 0.6
OB7 Control Functions / 108
START OVER TILE
The startover tile is used to restart the job from the beginning. The STARTOVER tile is
only used from within an IF/DO or IF/ELSE/DO portion of the job. It is not necessary to use
a STARTOVER tile at the end of the job. OB7 will automatically start over at the end of the job
(according to the setting in the ART tile).