EasyManua.ls Logo

Proto REFLEX RAIL - Hyper3 Regulator Adjustment and Maintenance; Velocity Adjustment

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VELOCITY ADJUSTMENT
The velocity of the RAIL™ is adjusted by adjusting the input
pressure into the RAIL™. This is controlled with the Hyper3™
regulator. The Hyper3™ on the RAIL™ is factory set to 150 psi which
will give you a velocity of about 285 FPS (Feet per Second).
A 3⁄16” allen key will be needed for this operation. Turning the
adjustment screw in (clockwise) will decrease the pressure, and
out (counterclockwise) will increase the pressure. To adjust the
velocity:
1. Make sure you and everybody around you is wearing ASTM/CE
approved paintball goggles.
2. Shoot the RAIL™ over a paintball chronograph.
3. To lower the velocity turn the Hyper3™ adjustment screw in.
To increase the velocity turn the screw out. Only turn the screw
a quarter turn at a time and shoot over the chronograph again.
Notice that a few shots are needed before the change can be seen
on the chronograph.
MAINTENANCE
For the REFLEX RAIL™ to function properly, it is essential that the
input pressure into the marker stays consistent at all times. The
general maintenance needed for the Hyper3™ regulator is to keep
it clean of dirt and debris at all times. A more extensive service
should be performed every 12 months by a trained Tech or if the
output pressure of the regulator doesn’t stay consistent. This can
be seen as inconsistent velocity and verifi ed with a regulator tester
(sold separately). Notice that the Hyper3™ has a break in period of
about 2000 shots before it achieves the best performance.
HYPER3 IN-LINE REGULATOR
ADJUSTMENTS AND MAINTENANCE
W W W . P R O T O P A I N T B A L L . C O M
20

Related product manuals