EasyManua.ls Logo

Pylontech Force-L2 - Page 23

Pylontech Force-L2
35 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 / 31
Connect the communication cables between battery stacks: one by one from Stack last to
the Stack 1 (from LinkPort0 to Linkport1).
Connect the communication cable between master battery stack (Stack 1) to the inverter.
The length of communication cable between stacks must 2m.
It is recommended to use cable provided by Pylon, if not the compatible water proofed
connecter (M19-RJ45) is necessary.
Or

Other manuals for Pylontech Force-L2

Related product manuals