Shanghai Pytes Energy Co., Ltd
⚫ Fix the base components on the wall with 10 expansion bolts.
⚫ Insert the bottom board into the base components.
When drilling holes, avoid the water pipes and power cables buried in the wall.
Step 2 Assemble the main body.
⚫ Fix the bracket on the wall with 5 expansion bolts.
⚫ Put the batteries on the base components.