Shanghai Pytes Energy Co., Ltd
Step 4 Turn off the DC isolators between the batteries and Busbars.
Step 5 Press “SW” button of master battery for 3 seconds, all indicators will light up and
off, the slave battery will be off automatically.
Step 6 Switch off the Power button of all batteries.
7.2 Routine Maintenance
To ensure that the battery can operate properly for a long term, you are advised to
perform routine maintenance on it as described in this chapter.
Before cleaning the system, connecting cables, and ensuring the grounding reliability,
power off the system.
Maintenance Checklist
The first inspection is 6
months after the initial
commissioning.
From then on, the interval
can be 6 to 12 months.