EasyManua.ls Logo

QUANTA QSSC-980 - Power Control Management

Default Icon
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
錯誤
!
尚未定義樣式
— Using the ESMS
101
Using Power Control Management
The Java RSM Power Control Management function controls the power state of remote servers. The utility en-
ables the administrator to power on/off, or reset remote server power locally or remotely. The addition of a
scheduling function enables the administrator to manage server power status at specified dates and times.
Figure 82 – Power Control Management
No. Item Description
1
Power Schedule
Control Panel
Manage power status and scheduling
2 Power Status Panel
Displays all detected BMC server power status
3
Power Control
Schedule Status Panel
Displays the power control schedule
Changing Remote Server Power States
To change individual or multiple server power states, perform the following steps:
1. Select Immediate and choose the desired power status from the drop down menu.
2. Select the servers to receive the state change signal in the Power Status panel.
Figure 83 – Changing Remote Power States
3. Click Submit. The requested power state change takes effect immediately.
1
2
3

Table of Contents

Related product manuals