11
Install the motor connection box lid.
12
Install the festoon electric connection box (if installed).
13
Release the main power button up from the pendant or radio controller.
14
Make sure that the trolley move's into correct directions by operating the trolley.
15
Make sure that the traveling speeds are suitable for customer needs by operating the trolley.
16
Make sure that the trolley slow-down ramps are suitable for customer needs by operating the trolley.
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
16/28
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.