EasyManua.ls Logo

Raven MPV-7100 - Page 26

Raven MPV-7100
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Drive Motor Control
Installation Instructions
8. Locate red power cable and place onto the red power
post, install M8 Flat Washer, Lock Washer and Hex
Nut and tighten with 13mm wrench (Fig. H).
9. Repeat Step 8 for black cable and black ground post.
10. Locate white plug and receptacle and reconnect (Fig. I).
11. Locate the (2) plugs under the large rubber boot
and
reconnect to their corresponding receptacles (Fig. J).
12. QC INSPECTION: Steps 8 - 11 must be checked
and
verified by Quality Control.
13. Place plugs back inside rubber boot.
M8 Nut, Flat
Washer &
Lock Washer
Red Power
Post
13mm
Wrench
Wiring
From DMC
H
Denver Global Products 1000 East Powell Dr. | Lincolnton, NC 28092 U.S.A
© 2014 Denver Global Products | RATO All rights reserved.
Rubber
Boot
Reconnect
Remaining (3)
Plugs Under
Rubber Boot
J
I

Other manuals for Raven MPV-7100