EasyManua.ls Logo

Raven MPV-7100 - Oil Maintenance

Raven MPV-7100
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PCB Board Replacement
Work Instructions
11.
Replace the top and bottom 8 or 10 mm bolts (Fig I & J).
12.
QC INSPECTION: Steps 7 11 must be verified by
Quality Control.
13.
Re-attach the switch cover.
14.
Replace the fender extension with the 5 mm Allen
wrench.
15.
QC INSPECTION: Steps 12 and 13 must be verified by
Quality Control.
16.
Close the service hatch.
I J
17.
Place the old PCB board in a box marked for quarantine.
Denver Global Products 1000 East Powell Dr. | Lincolnton, NC 28092 U.S.A
© 2014 Denver Global Products | RATO All rights reserved.

Other manuals for Raven MPV-7100