EasyManua.ls Logo

Raymarine ST1000+ - Installing the Tiller Pin and Mounting Socket; EMC Suppression Ferrites; Measuring the Critical Dimensions

Raymarine ST1000+
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4: Installing the Tiller Pilot 31
If a suppression ferrite is attached to a cable, this ferrite should not be
removed. If the ferrite needs to be removed during installation it must be reas-
sembled in the same position.
EMC suppression ferrites
We supply the fluxgate compass and power cables with suppression ferrites
fitted. Always use these ferrites supplied by Raymarine.
Connections to other equipment
If your Raymarine equipment is to be connected to other equipment using a cable
not supplied by Raymarine, a suppression ferrite MUST always be attached to the
cable near to the Raymarine unit.
4.2 Installing the tiller pin and mounting socket
CAUTION:
As the tiller pilot has a built-in compass, make sure that the boat’s
steering compass is at least 750 mm (2 ft 6 in) away to avoid
deviation.
Measuring the critical dimensions
The tiller pilot is mounted between the tiller and a fixed point on the structure of
your boat.Two dimensions are critical to ensure correct installation:
Dimension A = 589 mm (23.2 in): the distance from the mounting socket
to the tiller pin
Note:
This dimension increases if your installation requires a pushrod extension (see page
34) or cantilever mount (see page 37).
Dimension B = 460 mm (18 in): the distance from the rudder stock’s cen-
ter line to the tiller pin
D3548-2
81130_5.book Page 31 Wednesday, June 15, 2005 3:48 PM

Table of Contents

Other manuals for Raymarine ST1000+

Related product manuals