EasyManua.ls Logo

Real Flame 700 - WALL TERMINAL INSTALLATION STEPS; Exhaust Flue Termination; Power Cable and Air Intake Routing

Real Flame 700
51 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 | P a g e
Cut flue exhaust tube (hot tube) to length
(approximately flush with wall exit). Wall
termination will sit against wall.
Pull flue tube through approx. 100mm further (will
be pushed back once terminal fitted).
Feed power cable through wall and into wall
terminal.
Slide flue onto connection spigot fully. Tighten
clamp fully. Wipe excess silicon, visually check
connection to ensure connection is fully sealed.
Feed air intake flue pipe through location spigot
and fit retaining screw.

Related product manuals