EasyManua.ls Logo

Red Seal Measurement Neptune RML2000 - Pulse Output Units Connection

Red Seal Measurement Neptune RML2000
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7
1.2. Pulse Output Units (2400S Core Processor)
Remove the four screws that attach the housing cover and remove the cover. The 2400s requires the upper disc to
be removed before power or pulse connections can be made to the electronics. Loosen the two Philips screws on
the disc and pull disc straight up.
There is a plastic cover over the power terminals on the processor. Loosen the retaining screw and ip the cover up
to expose the power terminals. Connect power leads. Connect the pulse output wiring to terminals 3 and 4 (channel
B) on the terminal strip adjacent to the power connection. Reinstall the upper disc.