EasyManua.ls Logo

Reliance electric PSC PC-2 - Chapter 1 General Information; Receiving Inspection; Storing

Default Icon
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1-1
General Information
CHAPTER 1
General Information
The products described in this Operation Manual are manufactured or distributed by
Reliance Electric Limited.
The PSC Console PC-2 (hereinafter called "PSC Console) is used for monitoring,
setting and modifying various data to be required for the PSC3000/PSC4000/
PSC5000 Programmable Servo Control System.
1.1 Receiving Inspection
It is the user's responsibility that as soon as the equipment is delivered to his place,
he thoroughly inspects the equipment and ensures that he has received the
equipment ordered by him, that there are no missing items, and that no damaged
items are found.
1.2 Storing
After receiving inspection is completed, pack the equipment again and store it in a
cool, clean, and dry area until it is used. The equipment should not be stored under
direct sun light and/or at a place having corrosive atmosphere and/or vibration.

Table of Contents