21
INSTALLATION
INSTALLATION
Turn off the main power switch to the boiler and make sure that
the boiler shuts down properly.
Provided all the above conditions are satised, start the boil-
er up again, then analyse the combustion fumes, measure fuel
ow and re-check the door seal.
Flame inspection window
cooling
Pressure measurement point
9
A rubber socket is attached to the ame inspection window.
If this is used as a pressure measurement point, leave the
screw in place in order to close off the pressure measure-
ment line during normal boiler functioning. If the rubber
socket is used to cool the ame inspection window, remove
the screw to ensure an adequate air ow.
2.17 Maintenance
Regular maintenance is a legal requirement. It is also essen-
tial for the safety, efciency and durability of the boiler. Prop-
er maintenance keeps consumption and emissions down, and
ensures that the boiler continues to operate reliably over time.
Have your boiler serviced either by
R's Technical Assistance
Service or by a qualied heating engineer.
Analyse the combustion fumes before commencing any mainte-
nance. The results of fume analysis can give a clear idea of what
servicing or repairs are needed.
Turn the system’s main power switch OFF
Close all the gas cocks.
OPENING THE DOOR
Make sure that the top safety bolts (2) and bottom safety
bolts (3) on the hinged side of the boiler are tight;
completely unscrew the main xing bolts (1) and open
the door (these bolts are captive in the door and cannot
be removed).
1
2
1
3