2 INSTALLATION
2.1 Unpacking the product
R RTQ steel boilers come in 2 separate crates:
1 BOILER BODY CRATE to which is attached the documentation
envelope (A) containing:
− Instruction manual;
− Data label (to be applied to the casing on completion of
the installation);
− Certicate of Warranty and water test certicate;
− Bar code labels;
− Spare parts catalogue.
9
The following material, to be tted by the installer, is locat-
ed inside the combustion chamber:
− turbulators and turbulator xing clips (for installation in
the ue gas pipes);
− water connection anges;
− boiler body insulation and fasteners.
For tting instructions, see the section entitled "Fitting the
insulation and turbulators" on page 16.
MATERIAL
SUPPLIED
9
The instruction manual is an integral part of the boiler. Once
located, read it thoroughly and keep it safe.
2 THE CASING PANELS complete with assembly accessories (2
packs).
IMPORTANT
For the boiler to function correctly, it must be connected to a
R TECH control panel and dedicated control accessories.
Installation