7. Working life
63
DeutschEnglishFrancaisEspanolItaliano
The initialisation run can be performed with any hand switch if no error is present:
2-key hand switch
Ensure that all drives and controllers are interconnected and that the mains plug is not con-
nected. If you have pulled out the mains plug to perform an initialisation run, wait for at least
30 seconds before plugging it back in.
Keep the DOWN and UP keys on the hand switch pressed at the same time.
Plug the mains plug in and wait for about 5 seconds.
Release the keys.
Press the DOWN key again and keep it pressed until all drives have moved to or are at the
lower end stop.
Press the UP key and keep it pressed until all drives have moved to the upper end stop.
Should it be impossible to reach the top end stop, the initialisation run can be ended in any po-
sition by keeping the DOWN key pressed for 5 seconds. The position is the new end stop for
the drives.
The initialisation run is complete. The controller is now ready for operation.
The operation of the 2-key or 6-key hand switch is described in sections 7.10 and 7.11.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the RK Rose+Krieger MultiControl duo and is the answer not in the manual?

RK Rose+Krieger MultiControl duo Specifications

General IconGeneral
BrandRK Rose+Krieger
ModelMultiControl duo
CategoryController
LanguageEnglish

Related product manuals