EasyManua.ls Logo

RM Solar S Class 10 - Top Flashings

Default Icon
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
Section 4 - In Roof Frame Installation
Top Flashings
Starting from the left side. Push top corner ashing (16) under the wind protection rail (15), when
located correctly you should no be able to lift the leading edge. Fix with wood screw 5x30 (23) on the
right joint and with sealing screw (22) from the left side. Continue with parts (17/18/19).
16
22
17
18
23
23
22
Leading Edge