EasyManua.ls Logo

Rohde & Schwarz FSP3 - Manual Adjustment; Test Instructions; Measuring Equipment and Accessories

Rohde & Schwarz FSP3
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
R&S FSP Manual Adjustment
1164.4556.82 2.3 E-1
Manual Adjustment
In the following, the measuring instruments and auxiliary means required for the manual adjustment of
the R&S FSP, the appropriate preparations of the instrument as well as the individual adjustments will
be explained.
Test Instructions
The adjustment of the analyzer must be done after a warm-up time of at least 30 minutes and overall
calibration. Only in this case can the compliance with the guaranteed data be ensured.
Inputs for setting the R&S FSP during measurements are shown as following:
[<KEY>] Press a key on the front panel, eg [SPAN]
[<SOFTKEY>] Press a softkey, eg [MARKER -> PEAK]
[<nn unit>] Enter a value and terminate by entering the unit, eg [12 kHz]
Successive entries are separated by [:], eg. [ BW : RES BW MANUAL : 3 kHz ]
Measuring Equipment and Accessories
Table 2-1 Measuring Equipment and Accessories for manual adjustment of the R&S FSP
Item Type of
equipment
Specifications recommended Equipment
recommended
R&S Order
No.
Use
1 Frequency
counter
error < 1x10
-9
,
frequency range up to 10 MHz
Advantest
R5361B
with option 23
Frequency Accuracy of
Reference Oscillator
2 Signal generator frequency range to 1 GHz:
output level -10 dBm
R&S SMHU 0835.8011.52
Calibration Source 128 MHz
Frequency Accuracy of
Reference Oscillator
3 Power meter R&S NRVD 0857.8008.02 Calibration Source 128 MHz
4 Power sensor 1 MHz to 3 GHz
RSS 0.8%
Meter noise 20 pW
R&S NRV-Z4 0828.3618.02 Calibration Source 128 MHz

Table of Contents

Related product manuals