EasyManua.ls Logo

RS PRO IPM 3600N - Page 5

RS PRO IPM 3600N
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Phase Power Analyser / EN
09/30/16 Version No. 00 2
WARNING
Do not hold the test leads or probes beyond the finger guards or tactile barriers
Remove all probes, test leads and accessories that are not required for the test
Always use proper terminals, switch position, and range for measurements
Verify the instrument is operating correctly by measuring a known voltage before use. If in doubt,
have the instrument serviced
To avoid false readings that can lead to electric shock and injury, replace battery as soon as the
low battery indicator “
BT
appears
Follow all legal requirements
Obey posted instructions
Never assume that a circuit is de-energized, check it first
Always set up the measurement first, then connect the test leads and probes to the
instrument before connecting to the circuit under test
Connect the ground lead first, then the voltage leads and the current probe, Disconnect in
the reverse order
Route all test leads carefully
Remove test leads from instrument before opening the battery door or instrument case
CAUTION:
The measurement inputs U1, U2 and U3 are not isolated from each other, input
N is the common reference point. Connecting either U1, U2 or U3 to the circuit
means that the others are also live and therefore a danger of electric shock is
present. To avoid electrical shock, connect only the probes and test leads
required for the test.

Related product manuals