EasyManua.ls Logo

RS Toura - 7.5 - Hoisting The Jib

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
7.5 - Hoisting The Jib
To complete this section, you will require:
The jib
• The jib sheets
The furling line emerges from under the beam through
the cleat underneath the Port side.
Ensure that the furling unit is fully charged so that
all the furling line is wound round the unit (turn
anticlockwise) and very little left at the cleat.
Attach the head of the jib to the
swivel using the clevis pin and
ring. Ensure the swivel guide
runs freely on the forestay.
a)
b)
Attach the tack of the jib
to the furler unit using the
clevis pin and ring.