EasyManua.ls Logo

Ruijie Reyee RG-EG300GH-E Series - Preparing

Ruijie Reyee RG-EG300GH-E Series
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hardware Installation and Reference Guide Installing the Router
21
Read precautions
Prepare for installation
Install the device
Ground the device
Connect the power supply
Connect the cables
Bind the cables
Verify the installation
End
3.2 Preparing
Carefully plan and arrange the installation position, networking mode, power supply and cabling before
installation. Confirm the following requirements before installation:
The installation site provides sufficient space for heat dissipation.
The installation site meets the temperature and humidity requirements of the device.
The power supply and required current are available in the installation site.
The network cables have been deployed in the installation site.
The selected power supply modules meet the system power requirements.
The position of the indoor emergency power switch is learned before installation. The power switch is cut off
in case of accidents.

Table of Contents

Related product manuals