Hardware Installation and Reference Guide Verifying Operating Status
70
5. Click OK and the HyperTerminal window will appear.
4.2 Powering on Switch
Checklist before Power-on
The switch is fully grounded.
The power cord is properly connected.
The power cord retention clip secures the input power cord to the power supply.
The power supply voltage complies with the requirement of the switch.
The Ethernet cable is properly connected. The terminal (it can be a PC) used for configuration is already started. The parameters
are already configured.
Checklist after Power-on (Recommended)
After power-on, check the following:
Check the information on the terminal interface.
Check the LED status.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ruijie RG-S5300-E Series and is the answer not in the manual?

Ruijie RG-S5300-E Series Specifications

General IconGeneral
BrandRuijie
ModelRG-S5300-E Series
CategorySwitch
LanguageEnglish

Related product manuals