Remark: Choose up-flow regeneration for the valve without water bypass in regeneration,
raw water will flow out from the outlet when in Brine & Slow Rinse status.
1.6. Product Installation
A.Installation notice
Before installation, read all those instructions completely. Then obtain all materials and
tools needed for installation.
The installation of product, pipes and circuits, should be accomplished by professional
to ensure the product can operate normally.
Perform installation according to the relative pipeline regulations and the specification
of Inlet, Outlet, Drain and Brine Line Connector.
B.Device location
① The filter or softener should be located closely to drain.
② Ensure the unit is installed in enough space for operating and maintenance.
③ Brine tank needs to be close to softener.
④ The unit should be kept away from the heater, and not be exposed outdoor. Sunshine
or rain will cause the system damage.
⑤ Avoid installing the system in circumstance of acid/alkaline, magnetic or strong
vibration, because above factors will cause the system disorder.
⑥ Do not install the filter or softener, drain pipeline or overflow pipe in circumstance which
temperature may drop below 5℃, or above 50℃.
⑦ Install the system in the place where with the minimum loss in case of water leaking.
C.Pipeline installation(Take F105 for example)
① Install control valve
a.As the Figure 5 shows, select the riser pipe with 26.7 mm OD,
glue the riser pipe to the bottom strainer and put it into the resin
tank, cut off the exceeding pipe out of tank top opening and
make external rounding.
b.Fill the resin to the tank, and the height is accordance with the
design code.
c.Install the top strainer to the valve.