EasyManuals Logo

SAJ Suntrio Plus Series User Manual

SAJ Suntrio Plus Series
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #37 background imageLoading...
Page #37 background image
Suntrio Plus Series
-
36
-
button to confirm the selection.
Note: The configuration of the country of usage must be set before inverter
starts to run for its first time; otherwise, the inverter will not operate correctly.
If users cannot locate the corresponding country, please abort the setting
and contact the after sales for confirmation.
6.2.2 State
If the country has been set the LCD shows the machine type when the
inverter is started up, then it automatically displays the inverter operation
status: Initialization, Normal, Wait, Fault or Update.
Data name
Explanation
Initialization
Initialization of the system
Normal
The inverter in normal (function) operation
Wait
The inverter in stand-by state
Fault
A fault occurs during operation
Update
The state of updating firmware
Turn on the AC switch, the LCD begins to count seconds backwards, after
this, the inverter begins to connect the grid.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SAJ Suntrio Plus Series and is the answer not in the manual?

SAJ Suntrio Plus Series Specifications

General IconGeneral
BrandSAJ
ModelSuntrio Plus Series
CategoryInverter
LanguageEnglish

Related product manuals