SALVA INDUSTRIAL, S.A Horno Sirocco 00 Gas-Gasoil 50-60Hz (ing)121206.doc
1-7
1.7 DIESEL INSTALLATION
This should be carried out by authorized professionals according to regulations in the country in
question.
The maximum available power which can be withstood by the oven construction is as follows:
SP-21-C
SP-22-C
SP-23-C
SR-21-C
SR-22-C
SR-23-C
SK-21-C
SK-22-C
SK-23-C
Max. Power (KW) 96 67 49
The diesel supply installation should be carried out through copper pipe. The interior diameter can be
seen in the following table:
Vacuum
height in
feet/meters
Pipe length in feet/meters from the diesel tank to the burner of the oven
6 8 10 12 15 20
Inside diameter of the copper pipe in inches/mm.
1 6 8 8 8 8 8
1.5 6 8 8 8 8 10
2 8 8 8 10 10 10
2.5 8 10 10 10 10 12
3 10 12 12 14 14 16
It is absolutely necessary to place a diesel filter before the start-up. This filter is provided by SALVA
INDUSTRIAL, S.A.. It is very important to regulate properly the burner, in order to avoid ashes.