EasyManua.ls Logo

SAMES KREMLIN FPro G - Initialization of Follow-up in Production; Safety in Production; Use of the FPro G; First Commissioning

SAMES KREMLIN FPro G
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
7.5 Initialization of the follow-up in production
Identify the gun in the material tracking system.
- Set up a preventive maintenance program if necessary.
Refer to (10.110.1Preventive Maintenance Plan).
7.6 Safety in production
Respect the maximum recommended pressures:
- 6 bar max. in the gun.
- 1 bar max. in the GSP cup.
Do not point the gun at yourself or anyone else while spraying
Use an adapted and ATEX-certified conductive air hose.
8 Use of the FPro G
First commissioning
Refer to paragraph: 7 Commissioning

Table of Contents

Other manuals for SAMES KREMLIN FPro G

Related product manuals