EasyManua.ls Logo

Samson 3351 - Function Testing

Samson 3351
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-2 EB 8039 EN
Start-up
2. Slowly open the shut-off valves in the
pipeline. Slowly opening these valves
prevents a sudden surge in pressure and
highowvelocitieswhichcandamage
the valve.
Opentheshut-offvalvesrstontheup-
stream pressure side (upstream of the
valve). Afterwards, open all the valves
on the consumer side (downstream of the
valve).
3. Checkthevalvetoensureitfunctions
properly.
6.2 Function testing
Fail-close version
− The valve must be completely closed at a
controlpressureof0bar.
− Thevalvemuststarttoopenat3barat
the latest.
− The valve must be completely open at
6bar.
Fail-open version
− The valve must still be open at 0.5 bar.
− The valve must be completely closed at
4.5bar.
Control pressure and max. differential
pressureΔp
The'Controlpressureandmax.differential
pressureΔp
max
' table in the 'Design and
principle of operation' section shows the cor-
relation between control pressure and max.
differentialpressureΔpbasedonthepro-
cess medium used.

Table of Contents

Related product manuals