EasyManua.ls Logo

Samsung DVM S ECO AM XMDG Series - Insulating refrigerant pipes correctly

Samsung DVM S ECO AM XMDG Series
65 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
45
ENGLISH
Caution
Install the insulation without any gaps or cracks and use adhesive on the connection part of it to prevent
moisture from entering.
Bind the refrigerant pipe with insulation tape if it is exposed to outside sunlight. (When binding the pipe with
nishing tape, be careful not to reduce the thickness of the insulation.)
Install the refrigerant pipe respecting that the insulation does not get thinner on the bent part or hanger of
pipe.
When the thickness of insulation is reduced, reinforce the reduced thickness with additional insulation.
Insulator for refrigerant pipe
a x 3
Hanger
Additional Insulator
a
Insulate the refrigerant pipe
Make sure to insulate the refrigerant pipe, branch joint, distribution header, and the connection part of the pipes.
If you insulate the pipes, condensed water will not fall from the pipes.
Check if there are any cracks on the insulation at the bent part of the pipe.
Fix securely without any gap.
Install the insulation to be overlapped
Indoor unit
Insulator
Insulator
Clamp
Liquid side pipe
Gas side
pipe
Insulator
Insulating pipes Insulating pipes connected behind the EEV kit
The insulation of the gas and liquid pipes can be in
contact with each other but they should not press
excessively against each other.
When the gas side and liquid side pipes are
contacting each other, increase the thickness of the
insulation by one grade.
When installing the gas side and liquid side pipes, leave at
least 10mm of space.
When the gas side and liquid side pipes are contacting
each other, increase the thickness of the insulation by one
grade.
Gas pipe
Liquid pipe
Insulator
Insulator
Gas pipe
10 mm10 mm 10 mm
Liquid pipe

Table of Contents

Related product manuals