LED R&D Lab(VD)
104
2-2. IER + IER-F Extension (Up to Down)
• When F is installed horizontally on the installed IER Frame, use the default JIG of IER
(included in VG-LFR84FWL, VG-LFR53FWL, and VG-LFR52SWL).
• The Stud location of the default JIG must be adjusted (FIG 9).
• Align the JIG Stud with the JIG hole of the Frame.
*Be sure to check the hole locations – IER: 270 mm / IER-F: 240 mm
• Fasten the Frame F to the wall with screws.
Fig 9. Before and After Changing the JIG Stud Location
Screw
Fastening
Fig 10. Shape of Mounted JIG
Fig 11. IER-F Installed to the Bottom of IER
IER
②
IER-F
IER
FRAME
F FRAME