6. S-Box Installation and Connection
Installing it in a 19-inch server rack is recommended.
When connecting two or more times for the purpose of using multi-link HDR, install it on the ground shielded rack and use it. (SBB-
SNOWJMU model)
Make sure the air vent is open and not overturned or turned sideways.
Exercise caution to ensure that the air vent is not covered by an object. Covered air vent may cause overheating of the product.
If installing multiple S-Boxes, make sure there is a gap of at least 1U (44.45 mm) from the product at the top.
If installing an S-Box onto a wall, make sure there is a gap of at least 10 mm between the wall and the top, bottom and sides of the
product. Make sure there is a gap of at least 50 mm between the cable ports and the wall to ensure proper cable connection.
Maintain the residual heat inside the rack at a temperature below 35°C.
Exercise caution to ensure that no liquid enters the air vent of the product.
• Precautions for installing S-Box
SBB-SNOWJAU / SBB-SNOWJMU