LED R&D Lab(VD)
24
2. Preparation for Cabinet Installation
① Remove the tape on top of the package box and open the box. (See Fig.1.)
② Remove the Top–Cushion and open the shielding bag.
Hold the handles inside, take out the set, and then remove the PE bag. (See Fig.2.)
③ Check that the sliding bolts are properly fastened. (See Fig.3.)
Fig.1 Contents of the
package
Fig. 2 Opening the
package
Fig.3 Checking the bolts
handl
e
Top-
Cushio
n
IB &
cable
Bottom-
Cushion
LED
set
Box
SLIDING BOLT
Handle Shape
Top-Cushion
IB & cable
Bottom-Cushion
LED set
Box
SLIDING
BOLT
■ IER
■ IER- F
◆ Preparation for installation