EasyManua.ls Logo

Samsung IER Series - Page 118

Samsung IER Series
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
117
3-2. [Pivot] IER-F + IER-F Extension (Left to Right)
Fasten the installed Frame F Pivot and two Frame F Pivots to install on the JIG.
Align the JIG Stud with the JIG hole of the Frame. (without using the JIG screws)
Fasten the Frame F Pivot to the wall with screws.
Install it again after repositioning. (Fig 7)
Fig 7. Studs for Extension (Left to Right)
Installed Frame F
Pivot
Frame F Pivot to
install
Fastening
Screws
Frame F Pivot
to install
Frame F to
Install
Fig 8. Frame F Extension (Left to Right)
Fig 9. IER-F installed to the right of IER-F
Case Installation
IER-F
IER-F

Related product manuals