EasyManua.ls Logo

Samsung IER Series - Page 50

Samsung IER Series
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
49
6. S-Box Installation and Connection
• S-Box connection (Redundancy)
If a redundancy feature is required
Use the OCM cable to connect the DATA IN port on the Interface Gender to the DATA OUT port on the last cabinet.
Use 15100 m long CAT 6 *STP and *FTP level cables
to ensure HDBT signal stability.
Do not bend cables or bind multiple cables together.
SNOW-1801U

Related product manuals