EasyManua.ls Logo

Sapling SBP-31 - Double Mount Installation

Sapling SBP-31
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
19
20
18
36
The Sapling Company, Inc.
1633 Republic Road
Huntingdon Valley, PA 19006
USA
P. (+1) 215.322.6063
F. (+1) 215.322.8498
www.sapling-inc.com
Double Mount Installation
18) Place a housing frame onto each housing. You
should hear a snapping noise as the latches drop
into place.
17) Place a filter over each display board. You should
hear a snapping noise as the latches drop into place.
19) Hang the base of the pole on the mounting plate so that the lip is on top of the base, and the holes
for the screws are on the bottom of the base. Attach the wires from the pole to the wires in the gang box,
then use the two black base screws to attach the other side of the base to the mounting plate.
WALL
CEILING
20) Power the clock if you have not already done so. After testing the LED segments and presenting some
diagnostic information, the clock will display the time based off if its internal quartz oscillator. It will correct
itself to show synchronized time as soon as it receives data from an NTP server.

Related product manuals