Care and Maintenance
  Cubis MSE Operating Instructions  81
Transporting the Parts (Large Analytical Draft Shield)
t  Get the box for the individual parts of the balance ready�
t  Place the bottom foam piece in the box�
t  Place the panels in the packaging:
1)  Place the upper draft shield panel into the packaging (handle upwards)�
2)  Place the side draft shield panel into the packaging (handle upwards)�
3)  Place the other side panel into the packaging (handle downwards)� 
t   Then place the top foam piece in the box�
1
2
3