EasyManua.ls Logo

Satchwell IAC 600 - Page 16

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fi
g
.2
PRESET 2 – 2 Boiler Sequence Control (compensated) with a separate HWS System
Time re-synchronization
Pumps failed signal
Clear pumps failed
Pump 1
Pump 2
Boiler
1
High Limit Thermostat
(hand reset) and burner
controls.
*
Flow
Boiler
2
Pumps Failed
Pump 2
Pump 1
Boiler 2
HWS
Valve
Backend Valve 2
Supply
Backend Valve 1
HWS Sensor
Outside Sensor
Flow Sensor
Pump
Clear Pumps Failed
Connect to any IAC
isolated ground
terminal
Connect to any IAC 600
terminal
Note:–
The actual terminal block is a
double block running across
the bottom of the IAC. The
top (double height) block
contains terminals 1 to 33 and
the bottom (single height)
contains 34 to 41 and all of
the Ground and isolated
Ground terminals. Terminal
numbers run from left to right.
6
Ensure Terminal 2 is
earthed.
66
The 24Vac Supply must
be fused with a 2A fuse.
Terminal 5 is not used.
If an earth busbar is to be
used then it must be
connected to a single Ground
terminal on the IAC by a
single cable which should be
as short as possible and no
more than 150mm long. Earth
wire minimum 30/0.25
(1.5mm
2
) Stranded Cable.
Any IAC 600
terminal
HWS
Valve
Boiler 1
Time re-synchronization
TIME SCHEDULES
08:00 to 17:00
Connected to the compensator and HWS loops.
The time re-s
y
nchronization input will re-s
y
nchronize the IAC time to
midni
g
ht Monda
y
.
COMPENSATOR
Schedule OUTSIDE SUPPLY
080
10 50
20 20
The outside temperature value is fed into a look-up table. The result
is passed to the controller RPW input and is used to set the controller
set value.
Proportional Band 10
Inte
g
ral Action 300
Derivative Action 0
Ramp Time 60
Sample Time 10
BOILER/BACKEND VALVE
The lead boiler backend valve is alwa
y
s held open with the other one
bein
g
enabled on demand. The lead boiler rotates ever
y
100 hours.
The lead boiler is enabled when the control demand si
g
nal exceeds
33% with the second boiler and backend valve bein
g
enabled a 66%.
There is a 5% h
y
steresis on both steps. The call for heat si
g
nal from
the HWS is linked to the lead boiler to ensure that the boiler fires if
HWS is re
q
uired under low load conditions.
PUMPS
Two pump outputs are supplied, Pump 1 normall
y
runs when the
controller is re
q
uestin
g
heat. In the event of pump 1 failin
g
to run a
differential pressure switch si
g
nals the IAC which enables pump 2.
In the event of pump 2 failin
g
the "pumps failed" outputs is enabled.
A "clear pumps failed" input is supplied to enable the failed pumps to
be used once the
y
have been repaired or reset.
VALVE OPTIONS
Both the HWS and backend valve actuators ma
y
be 0 to 10Vdc or
24Vac driven, it should be noted however that valve operation in all
cases is purel
y
on/off and not modulatin
g
.
DS 2.951A 16 - 24 05/98