Fi
.3
PRESET 3 – 3 Boiler Sequence Control (compensated) with a separate HWS System
Time re-synchronization
Pumps failed signal
Clear pumps failed
Pump 1
Pump 2
Boiler
1
High Limit Thermostat
(manual reset) and
burner controls.
*
Flow
Boiler
2
Boiler
3
Pumps Failed
Pump 2
Pump 1
Boiler 2
HWS
Valve
Backend
Valve 1
Supply
Backend Valve 3
HWS Sensor
Outside Sensor
Flow Sensor
Pump
Clear Pumps Failed
Connect to any IAC
isolated ground
terminal
Connect to any IAC 600
terminal
Note:–
The actual terminal block is a
double block running across
the bottom of the IAC. The
top (double height) block
contains terminals 1 to 33 and
the bottom (single height)
contains 34 to 41 and all of
the Ground and isolated
Ground terminals. Terminal
numbers run from left to right.
6
Ensure Terminal 2 is
earthed.
66
The 24Vac Supply must
be fused with a 2A fuse.
Terminal 5 is not used.
If an earth busbar is to be
used then it must be
connected to a single Ground
terminal on the IAC by a
single cable which should be
as short as possible and no
more than 150mm long. Earth
wire minimum 30/0.25
(1.5mm
2
) Stranded Cable.
Connect to any
IAC 600
terminal
HWS
Valve
Boiler 1
Time re-synchronization
Backend Valve 2
Boiler 3
TIME SCHEDULES
08:00 to 17:00
Connected to the compensator and HWS loops.
The time re-s
nchronization input will re-s
nchronize the IAC time to
midni
ht Monda
.
COMPENSATOR
Schedule OUTSIDE SUPPLY
080
10 50
20 20
The outside temperature value is fed into a look-up table. The result
is passed to the controller RPW input and is used to set the controller
set value.
Proportional Band 10
Inte
ral Action 300
Derivative Action 0
Ramp Time 60
Sample Time 10
BOILER/BACKEND VALVE
The lead boiler backend valve is alwa
s held open, with the others
bein
enabled on demand. The lead boiler rotates ever
100 hours.
The lead boiler is enabled when the control demand si
nal exceeds
25% with the second boiler and backend valve bein
enabled at 50%
and the third at 75%. There is a 5% h
steresis on all three steps.
The call for heat si
nal from the HWS is linked to the lead boiler to
ensure that the boiler fires if HWS is re
uired under low load
conditions.
PUMPS
Two pump outputs are supplied, Pump 1 normall
runs when the
controller is re
uestin
heat. In the event of pump 1 failin
to run, a
differential pressure switch si
nals the IAC which enables pump 2.
In the event of pump 2 failin
the "pumps failed" output is enabled. A
"clear pumps failed" input is supplied to enable the failed pumps to
be used once the
have been repaired or reset.
VALVE OPTIONS
Both the HWS and backend valve actuators ma
be 0 to 10Vdc or
24Vac driven, it should be noted however that valve operation in all
cases is purel
on/off and not modulatin
.
05/98 17 - 24 DS 2.951A