6 – MAINTENANCE (ROUTINE AND SPECIAL) COD.150M230.T.2021
THE PRESENT MANUAL BELONGS TO - Schenker Italia - ALL RIGHTS RESERVED
45
4. Open the depressurization valve
(turn counter clockwise).
5. Start the watermaker with the by-pass activated.
6. Leave the unit running for approx. 20 minutes,
checking that the hoses are properly positioned in
the recipient, so that to avoid inhaling air.
7. Shut the plant off and connect the original hoses.
CAUTION
It is necessary to perform the first start-up procedure when restarting the plant after a shutdown
procedure, in order to purge the air and drain out board the chemicals in the systems.