EasyManua.ls Logo

Schwinn 145 - Final Assembly and Checks; Final Inspection Procedure

Schwinn 145
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
11. Attach Water Bottle Holder to Console Mast
Note: Hardware is pre-installed on Mast and not on Hardware Card.
12. Connect AC Adapter to Frame Assembly
12
13. Final Inspection
Inspect your machine to ensure that all hardware is tight and components are properly assembled.
Be sure to record the serial number in the field provided at the front of this manual.
Do not use until the machine has been fully assembled and inspected for correct performance in accordance with the
Owner’s Manual.
15

Related product manuals