Boiler Calibration
1. Turn the main power switch off and remove the cover. Check to see that the reservoir has
distilled water.
2. Install a juniper on terminal W I located to the left of the microprocessor on the
PCB.
3. Turn on the main power switch and insert a cassette.
4. The LCD will show CALIBRATING with two digits in the upper left corner of
the display and two digits in the upper right corner of the display. The value in
the lower left corner of the display is the difference between the steam generator
(boiler) and chamber temperatures. The value in the lower right corner of the
display is the chamber temperature.
F9> CALIBRATING <C8
+2.00°C 135.00°C
EXAMPLE
5. To start the steam generator (boiler) self-calibration cycle, hold down the UNWRAPPED
button and press the START button. The two digits in the upper left corner will change to
00> and an asterisk* will appear beside the message CALIBRATING*.
00> CALIBRATING* <C8
+2.00°C 135.00°C
EXAMPLE
6. The calibration cycle will last approximately 5 minutes. A long beep will sound indicating the
calibration is complete. The 00> in the upper left corner of the display should change to two
digits.
F6> CALIBRATING* <C8
http://www.sterilizers.com/statim-trouble-shooting-manual.html (17 of 26) [3/27/2004 9:23:44 PM]