EasyManua.ls Logo

Sebart Wind S 110 ARF - Section 1 - Ailerons Installation

Sebart Wind S 110 ARF
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 1 – ailerons installation
 step 1
Locate the wing panel and his aileron. Trial fit the four aileron hinges, included in the hardware
pack, in their place and verify the correct position and alignment of the aileron with the wing panel.
 step 2
Carefully glue, with some drops of thin CA, each of the four hinges in the aileron.
 step 3
Locate the aileron and carefully glue, with some drops of thin CA, the hinges into the wing panel.
5

Related product manuals