23.5.2 Pre Rack #2 Tests
The following tests are done to the SG-2000 after 12 hours on Rack #1 and
before 12 hours continuous cycling 150 W CW transmitting on 4.5 MHz into the
light bulb antenna load on Rack #2:
Inspection before removal from Rack #1
Bench inspection (visual, ohms, serial, etc.)
PLLs voltages check and adjustment
Receive SSB sensitivity check
Receive AM sensitivity check
ALC 150/50 W transmit adjustment
Carrier insertion check and adjustment
150/50 W transmit adjustment
Head functions check
Communication with SGC Base Station
11.94 oscillator check and adjustment
Installation on Rack #2 and Test Log entry
23.5.3 Pre Exit Tests
After 24 hours on the testing racks and before any unit goes out the door, it
receives these final inspections:
Inspection before removal from Rack #2
Bench inspection (visual, ohms, serial, etc.)
Receive SSB sensitivity check
Carrier insertion check and adjustment
150/50 W power check for 1.6-30 MHz
SGC Smartuner™ check
Head functions check
Communication with SGC Base Station
11.94 oscillator check and adjustment